Chuyển tới nội dung chính

Bulk Assign Tasks in a Project

Use Case: Need to bulk assign all the Tasks in a Project to aUser.
Steps:

  1. Create a Project.
  2. Create Tasks in that Project.
  3. Go to Task List and filter the Tasks based on the Project as shown below:
  4. Select all the Tasks (or the Tasks you wish to assign to the User).
  5. Go to Actions \u003e \