Stock Reservation for Production Plan
\u003e Note: This feature will be available in the ABNERP version 16 \u003e \u003e
Stock reservation in a production plan is important because it ensures that the required raw materials and sub-assemblies are available to start the manufacturing process. It also ensures that the purchased raw materials against the production plan are used exclusively for the respective production plan.
How it Works in ABNERP
The user activity diagram for the production plan reservation is shown below.
The user must enable the checkbox \